Restoration

With the appointment of Master Shipwright, Tim Goldsack, CAMBRIA started her three year re-build in November 2007. Now located in Faversham and secure from the weather in a covered dry-dock. the process of stripping out the old timber began.

By keeping the original planking as a template, new frames were progressively secured in place.By September 2008 the main frames had been shaped and fitted using sustainable oak from Somerset.

By mid 2009 with the bow and stern framing complete, the hull planking had started and by 2010 the main deck had taken shape. Six months later the side rails and hatch coamings were in place.

Frames in July 2010
Frames in July 2010

Progress over the following winter was delayed due to exceptionally harsh weather, but by March of the following year, after 41 years, the famous Sailing Barge CAMBRIA once again took to the water.

With sea trials programmed for July 2011, there remained much to do: installing the diesel generator and hot water boiler; constructing cabin accommodation for 12; installing comfortable domestic and washroom facilities; fitting out the galley and seating area; converting the main hold into an education and interpretation centre; re-installing the original skipper’s cabin and rigging the masts and spars.

On 17 July 2011, CAMBRIA set out for her first charter, during which she participated in the prestigious Thames Sailing Match, finishing some 2 miles ahead of her nearest rival. The CAMBRIA, now fully restored, is once again out in front.

Facebook

Cambria Trust

2 days ago

Cambria Trust

Cambria Trust added 3 new photos.

Cambria is in the drydock at Fullbridge for a scrub and antifoul.
... See MoreSee Less

Cambria is in the drydock at Fullbridge for a scrub and antifoul.
View on Facebook
·Share

  • Likes: 0
  • Shares: 5
  • Comments: 2

So beautiful. When she is in Dry dock like that you can really see the diferences between the Kent and Essex barges and the lines of construction. Is that the original Transom cos to me it seems a bit more angular. Wasnt she registered at Rochester originally? Or was it just that she was kept there(flags flying, she was lovely.)

2 days ago

1 Reply

Avatar

Here's one from the late sixties in upnor my dad repairing the rudder

Attachment2 days ago   ·  3

2 Replies

Avatar

Comment on Facebook

Cambria Trust

2 weeks ago

Cambria Trust

Cambria Trust added 3 new photos.

The baggywinkle has been fitted to the barge to stop the mains'l rubbing on the wire when brailed up
... See MoreSee Less

The baggywinkle has been fitted to the barge to stop the mainsl rubbing on the wire when brailed up
View on Facebook
·Share

  • Likes: 0
  • Shares: 3
  • Comments: 3

hah never found out that thats what it was called!

2 weeks ago
Avatar

Can I have a bit for the receding hairline!!

2 weeks ago

1 Reply

Avatar

took a few hours to make it

2 weeks ago
Avatar

Comment on Facebook

View on Facebook

Follow Us On Social Media

  • Facebook
  • Twitter

Recent Posts

  • Cambria Trust 2018 Annual General Meeting
  • Coverage in the Medway Messenger
  • Rough Passage by Brian Bridges
  • Medway Barge Match 2017 Report
© 32 Pilgrim's Way, Cuxton, Kent, ME2 1LG